As-Constructed plans
Commencing April 2020 Council requires the licenced plumbing contractor to provide an As-Contructed drainage plan to the Council prior to a final inspection being carried out.
The As-Constructed plan is to indicate the sewer connection details and all in-ground sanitary drainage plus the location of the water meter and in-ground water service to the point of entry.
The As-Constructed plan should be drawn on the Bundaberg Regional Council template provided below and be either A4 or A3 size. The fact sheet below contains an example indicating the minimum standard required.
Failure to provide the As-Constructed drainage plan prior to the final inspection or to the required standard may result in the inspection not being carried out.
Your As-Contructed plan can be emailed directly to Council's Plumbing Team.
Download the fact sheet and template: